Terms and Conditions of Service for Eden Woodland Consultants Ltd
The Contractor – the person or business undertaking the works & The Client – the person or business instructing the works (and in so doing, and accepting the quote, agrees to / accepts the following terms and conditions.)
- ‘Notice of the Right to Cancel’ - the client has a mininum 7 days to cancel the contract (in writing) from acceptance date.
- This quotation/estimate is valid for 60 days and takes into account any ‘value’, monetary or otherwise, the arisings may have unless stated otherwise.
- All works will be in accordance with the current British Standard 3998 ‘Tree Work Recommendations’ where possible unless specified otherwise. Dimensions specified are approximate and, wherever possible, will be to the nearest appropriate pruning point.
- In the event of a variation to the quotation as a result of:
- Amendments to works required prior to arriving on site, or
- Changes in site / ground conditions since the original visit, or
- Additional works requested / required whilst on site
- Stump-grinding will be to a depth of 200 below the immediately adjacent ground level and will include the removal of the stump and buttress roots but will not include lateral roots unless otherwise specified. The client will advise the contractor of any underground services in the vicinity of the stump prior to starting the job.
- All arisings (including twigs / branches / woodchips / logs / trunks / foliage etc) will be removed from site and become the property of the contractor unless specifically stated otherwise in the quotation.
- On completion of the works, an invoice will be raised and payment is required within 30 days OR payment is required in full on completion of the quoted works (unsatisfactory completed jobs MUST be immediately notified, in writing / by email, to the contractor or within a minimum period of 24/36/48 hours).
- Following written/verbal instructions from the client, the contractor will check with the Local Planning Authority (LPA):
- Whether the tree(s) are the subject of a Tree Preservation Order
- Whether the trees are located within a Conservation Area
- The contractor has £10million Public Liability Insurance and a copy of the certificate is available on request. The contractor will operate in accordance with good industry practice, their Health & Safety Policy and Procedures and undertake Site Specific Risk Assessments (the outcomes of which may place constraints on the site whilst works are in progress, i.e. the client can’t access their shed without prior agreement from ground staff.)
- The site will be left generally ‘clean, tidy and safe’ but because of the very nature of the works including the production of wood dust, chainsaw / wood chippings / twigs / leaves and needles etc. and the traversing of site personnel it will not be as it was prior to commencement of works.
- If the works spread over multiple days, the site will be left appropriately and safe and as agreed with the client beforehand
- The contractor will undertake the works as scheduled but is aware of / may be constrained by ecological and wildlife legislation including:
- Wildlife and Countryside Act 1981
- Countryside and Rights of Way Act 2000
- Conservation of Habitats and Species Regs. 2012 (amendment)